dannyd2310
dannyd2310 dannyd2310
  • 02-04-2019
  • Computers and Technology
contestada

Why is the monitoring and controlling phase extremely important to the success of the project

Respuesta :

zdgzr
zdgzr zdgzr
  • 22-01-2020

Answer: It is the only way to ensure that work plan estimates are on track and that early intervention can take place.

Explanation: APEX

Answer Link

Otras preguntas

A phone company uses the equation y=0.15x+10 to find y the monthly charge for a customer sending x text messages. How many text messages are sent if the monthly
a rectangle has an area of 30 square meters and a perimeter of 34 meters. what are the dimensions of the rectangle?
Donald Johanson, Tom Gray, and others discovered a hominid that lived in East Africa__________ million years ago and nicknamed her Lucy, whose scientific name t
A rectangular bedroom floor has an area of 100 square feet and a length of 10 feet. What is the perimeter of the floor?
A rectangular bedroom floor has an area of 100 square feet and a length of 10 feet. What is the perimeter of the floor?
How do you say" leave me alone" in Spanish
what does imperialism mean?
how many yards in 1/4 of a mile? Please help
what is the density of a orange if its mass is 158.2 g and the volume is 106 mL
Find the surface area of a rectangular prism with a length of 6.9mm, a width of 8.2mm, and a height of 14mm.