ballerstatus4289 ballerstatus4289
  • 02-03-2020
  • Business
contestada

In an activity-based costing system, what should be used to assign a department’s manufacturing overhead costs to products produced in varying lot sizes?

Respuesta :

Remzwisdom
Remzwisdom Remzwisdom
  • 03-03-2020

Answer: Multiple cause-and- effect relationship should be used

Explanation:

A multiple cause-effect relationship is a relationship in which an event (the cause) makes another event happen (the effect).

A particular cause can have several effects.

Answer Link

Otras preguntas

Peter is trying to buy fencing for the perimeter of his garden. His garden is in the shape of a rectangle with a length of 2(x+6)feet and a width of 3.5x feet.
What is the area of this shape?
HELP PLEASE IM ON A TIME LIMIT. I PUT ALL OF POINTS INTO THIS. In a world of technology, how can an individual reduce the risk of becoming a victim of identity
Geometry math question no Guessing and Please show work thank you
Look at the figure find y
What is the volume of the container?
What is the value of Σ^3(4*(1/2)^I-1) I=1 ? a.7/8 b.8 c.7/2 d.7
What is the length of KL if the quadrilateral is a rhrombus
Someone please solve for me I’m confused
Write a Let" statement for the unknown, write an equation, and solve the equation. 11. Jane bought a number of records for $7 each. She then spent $3 more for a