When looking at a program board at the end of program increment (PI) planning, what does it mean when a feature is placed in a team's swim lane with no strings

Respuesta :

IfeanyiEze8899 IfeanyiEze8899
  • 04-01-2021

Answer:

It simply means that other teams can independently complete the feature.

Explanation:

PI or program increment is a planning interval during which an agile release train (ART) plans and produces working and tested software and systems. It takes a duration of 8 to 12 weeks

Agile teams can access and independently complete various ARTs found in their swim lanes with no strings.

Answer Link

Otras preguntas

If a = -5x and b = 3x – 4i, then find the value of the a^3b in fully simplified form. (Please help)
What do waves transfer? A only matter B energy C only water D only particles
Assigning common fixed costs to segments impacts ______.
It is believed that up to ____ percent of college students under the age of 25 may develop depression Question 2 options: 40 25 65 15
Question 5 (1 point) When researching Albert Einstein, which resource is MOST credible? Your teacher Author of Einstein biography Wikipedia A current relative
C3H8 + 5 O2 --> 3 CO2 + 4 H2O Double replacement reaction Decomposition reaction Single replacement reaction Combustion reaction Synthesis reaction
What was the continental congress
54 is what percent of 24? Enter your answer in the box.
help me pls ill give brainlest
All functions of the cerebellum are concerned with:.