medm0om5iebernan medm0om5iebernan
  • 01-11-2016
  • Mathematics
contestada

A construction company delivered 40 loads of concrete in 5 days.

What was their rate of work?



A.




B.




C.




D.


Respuesta :

melhunt99
melhunt99 melhunt99
  • 05-11-2016
Well 40 divided by 5 is 8 and you don't have options so I would say 8 loads a day :)
Answer Link

Otras preguntas

A photon has a wavelength of 3.8 × 10-7 meters, which is between visible and ultraviolet. Calculate the energy of this photon.
simplify A) sin^2 theta B) cos^2 theta C) tan^ theta D) 1
Duane miller wants to know what price home he can afford. his annual gross income is $60,000. he has no other debt expenses and expects property taxes and insur
y=1/3x - 4 y=-7/3x +4 in substitution
Describe the decline of Olmec
"An Essay of Dramatic Poesy" was written during the time period known as A. the Renaissance. B. the Norman era. C. the Middle Ages. D. the Restoration.
give an example of motion in which displacement of the particle is zero but acceleration is not zero in journey?
Help please! :) Transform each polar equation in rectangular coordinates and identify its shape. 1. theta= 1.34 radians 2. r=tan(theta)sec(theta)
Which of the following statements is true about “There's a Man in the Habit of Hitting Me on the Head with an Umbrella”? It is funny because it is absurd. It
Solve each word problem using a system of equations. Show work please! #59 and #60.