icoolguy43110 icoolguy43110
  • 03-03-2021
  • Computers and Technology
contestada

underfloor, cellular concrete floor, cellular metal floor, surface, wireway and busway are all kind of
A. raceways
B. conduit
C. wiring
D.NEC rules

Respuesta :

Netta00 Netta00
  • 08-03-2021

Answer:

Option C

Explanation:

Underfloor, cellular concrete floor, cellular metal floor, surface, wireway and busway are all kind of wiring.

In these wiring method, a conduit body or a box is installed at  conductor splice, outlet, switch, junction, termination or pull point.

Hence, option C is correct

Answer Link

Otras preguntas

how many minutes is it before 12 noon if 20 minutes ago it was three times as many minutes after 9 am
What is 10 percent of 80
A punch  recipe calls for 3 pints of orange juice does the recipe How many ounces oof oranges juice does it requirew
a swimming pool is 20 meters long and 12 meters wide the bottom of the pool is slanted so that the water depth is 1.3 at the shallow end and 4 meters deep at th
What would be m minus 4 in an algebraic expression
Cellular respiration involves a series of chemical reactions. Which of the following is a primary way that enzymes affect these reactions? A. They decrease the
If a+b=6 and a-b = 4, what is the value of 2a + 3b?
How many quarts in 24 pints?
What happens at a conservative plate boundary? Someone please help me in this because I have test today. Aswell please don't copy it from the internet.
How many quarts in 24 pints?