hannahgrace31511 hannahgrace31511
  • 03-11-2021
  • Mathematics
contestada

A chef can finish a catering job in 4hr. His student can do the same job in 12hr. How long will it take them both to do the job if they work together

Respuesta :

shayy1616 shayy1616
  • 03-11-2021
12 divided by 4 equal 3
Ans:3hrs
Answer Link

Otras preguntas

Find the value 9x10^4
how many times larger is 3.5 than 3.25
Write a description of an array of stickers using the product of 3 x 15.
what is the value of the 4s in 344?
What is 6,007,200 and 32,005,008 in expanded form?
write 73,489 in expanded form
9 more than the product of 51 and a number t
what number is one thousand more than 700,012
Amanda's jewelry box is in the shape a cube that has 6inches edges volume of Amanda's jewelry box?
what is 1700000 divided by ,10?