ReffetoriReeveh ReffetoriReeveh
  • 03-02-2017
  • Business
contestada

In the execution phase of a project's life cycle, activities are guided by decisions that were made in the __________ phase.

Respuesta :

MissPhiladelphia
MissPhiladelphia MissPhiladelphia
  • 14-02-2017
The choices can be found elsewhere and as follows:

A.initiating
B.planning
C.monitoring/controlling
D.closing
E.assessment

I believe the correct answer is option B. 
In the execution phase of a project's life cycle, activities are guided by decisions that were made in the planning phase. Hope this answers the question.
Answer Link

Otras preguntas

how many milillerters of cholcolat milk are in the container shown
Find a linear equation with two variables that, together with the equation 10x + 5y = 1, would comprise a system without a solution.
Drama (genre): What is the opposite of dramatic irony?
How many squares with a side of 3 cm can fit in a 12 cm by 3 cm rectangle
2. A football is punted into the air. Its height h, in metres, after t seconds is given by the equation h(t) = -4.91? + 24.5t + 1 a) How high is the ball after
Please write no more than two paragraphs. Assignment is worth 25 points We have been talking about variables and how they are measured. For this assignment, I h
how many quarters are in 20 dollars?
On what basis is segregated public schools unconstitutional
Is happy a greeting word or not ?​
How many square meters are there in a floor that is 9 meters long by 12 meters wide? 99 108 109 117