matcardoso
matcardoso matcardoso
  • 04-07-2017
  • Mathematics
contestada

need help!!! date in maturity

need help date in maturity class=

Respuesta :

Aliwohaish12
Aliwohaish12 Aliwohaish12
  • 04-07-2017
The future value formula of simple interest is
A=p (1+rt)
A future value?
P present value 2000
R interest rate 0.12
T time 60/360 for the first period
A=2,000×(1+0.12×(60÷360))
A=2,040

For the second period which is 90/360 the present value of it after the payment of 1000 is 1040 (2040-1000)
Now use the formula again
A=1,040×(1+0.12×(90÷360))
A=1,071.2....answer

Answer Link

Otras preguntas

What are the co-vertices of the following graph?
In which condition does the skin have a yellow color
How to have self confidence when your really shy
I need help find which one is common and which is documented.Is it common knowledge, or must it be documented? A.) George Washington was the first president of
Find the dimensions of an American football field. The length is 200 feet more than the width, and the perimeter is 1040 feet. Find the length and width?
The Mogan River is 465 miles long. The Hofman River is about 76% of the length of teh Mogan River. How long is the Hofman River?
Factor the polynomial x^2+3x-10 your answer can be written as (x+A)(x+B) where A And A equals =? and B equals =?
What is the basic unit for measuring time
what is 60.75 x 4/5=
Write complete sentences to tell what everyone does. Be sure to use the correct form of each verb. Samuel (descansar)